How many binding wire is use in arrangement of 25mt steel
Answer Posted / shweta garg
in steel reinforcement binding wire required is 8kg per MT, so for 25MT the binding wire required is 25*8= 200kg
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
how many kg of 20mm, 10mm, dust available in one ton stone boulder
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
rate analysis for cement pointing 1:4 , for 100 sq m
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Why are the bolts that hold steel rails together in oval holes?
what is civil enginnering & what you need of this course?
Formula of mid span bar
Why steel rods are produced only in even dimensions?
How do we calculate absolute pressure?
Explain the importance of moment of inertia?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
material used for mendrel use to bend epoxy coated rebar