in a building why we are using T beams?
why can i adopt beam bottom & Top level as same as slab
bottom & Top level?
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate steel for beam slab and column
In 1:2:4 ratio how much kgs of cement,fine&coarse aggregates to be used 1cu.m
time and work questions
How much cement,sand,bricks and water needed for 1square metre brick work?
What is oneside mat. And explain
Difference between wbm and gsb in road construction
4 Answers CPWD, GSB, Ircon, JMC Projects, L&T, RD,
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
what is modular brick and it size
what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
binding wire requirement in rcc structures
how to calculate mivan shuttering matrial
Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)