choose the non-switch device
(A) transformer
(B) diode
(C) transistor
(D) IC
Answers were Sorted based on User's Feedback
What is the tests required for a 132 kV, 400 kV , 765 kV for a Circuit Breaker and Power Transformer before commissioning ?
0 Answers Eprosys Engineering Consultants,
difference between over current and over load protection?
what clearance required for 4.5 mva dry type transformer?
Wind mill
why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?
What is the meter used to check the DG sound level.and pollution check
What's mean HVF & HAF in Vacuum Circuit Breaker?
0 Answers Gandhi Institute of Technology and Management (GITAM), Hyundai, Jayam Engineering Works,
how can we check a fully charged battery?
6 Answers BEML, Singareni Collieries,
How do you select a cable size(Cu & Al) for a particular load?
A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.
why battery dc voltage become Half when we check with respect to ground for example 120volts + and - terminals and when we check + terminal with Earth thats 60volts why 60volts we can not ground the battery.
Distinguish between shunt and series field coil constructions.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)