A electrical meter has load 500 kw. In 2 hr what rading will come on meter.
Answers were Sorted based on User's Feedback
Answer / rishiraj
500KW/hr = 500 units
500KW/2hr = 1000 units
So after 2 hrs meter will show addition of 1000 units in meter reading.
E.g.: Before operation of 2 hrs meter reading is 5000, then meter reading will be 6000 after operation of 2 hrs.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / pradeep kumar satapathi
If load is constant for two hours then the total consumption or generation will 500+500 i.e. 1 MW ONLY.
| Is This Answer Correct ? | 2 Yes | 1 No |
why any surge protection is not provided to UHV ac transmission line (765kv) ?
1 Answers NK Power Systems, Reliance,
(1)WHAT HAPPENS WHEN SUDDENLY LOAD GIVEN TO THE INDUCTION MOTOR ? (2)CAN WE MAKE WOOD AS MAGNET ? (3)WHAT IS THE VALUE OF MAGNETIC FLUX DENSITY IN TRANSFORMER ? (4)WHY WE ARE USING ELECTROMAGNETI NOT ELECTROSTATIC IN MACHINE ?
what is thermal resistance of PVC Cable.
what is the clearances between phease to phease & phease to earth in 400 kv transmission line?
The exciting current of a transformer is non sinusoidal. why?
how to calculate the loss tangent of electrical cables
What are the applications of the electric motors?
for compensate 315mh inductance ,how many capaciance required?
hello friends this is krunal here.. i have applied for he officer train in hpcl electrical stream.. any one who have applied before for electrical stream please help me out.. post ur reply to my mail id: krunal_airforce@yahoo.com.. any tips, old questions for paper or any help will do.. plz help me.. your faithfully, Krunal Darji
i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
Whether capacitor loads can be connected for testing a diesel engine at its full load capacity? Is there any limitation of capacotir load? Which is the best load for testing DG sets?
i am completed my degree(B.E EEE) 2014 anychance to get electrical licence plz help me
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)