how many shuttering material required for 100 sqm
Answer Posted / maria alphonse pandian
This question is not clear whether the shuttering is for coloumn or slab or beam as it is variable structure to structure.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is features of a typ-ical modern air-conditioning installation?
What is the crank length in the slab?
how to calculate valuation for the old building?
Why does the pressure increase under soil?
crank types
very simple or less time consuming formula for reinforcement calculation by moment
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
How do you calculate load bearing capacity of a waffle slab?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
IS code for grade of concrete for bamboo lintel????
Explain major differences between routing maintenance and major maintenance.
Test procedure of fly ash bricks as per code ?
what is diversion?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?