all rod lapping formula
Answers were Sorted based on User's Feedback
Answer / sandeep verma
Total length is 50 Mtr
Cutting length is 6 Mtr
Dia of bar is 32 mm
Standard lap length will be taken as 50D means 50 X Dia of bar. Then it will be 50 X 32 =1600 MM
50MTR/6MTR = 8Nos + 1 = 9 no of lap.
| Is This Answer Correct ? | 2 Yes | 0 No |
in 100 cft = 1350 bricks in 100 cft = ? bloks
state and explain in Water absorption of brick
appsc AEE'S interview questions wanted
what is mean by c32/40s concrete class
which steel is better for residential building tmt steel or hysd steel
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
how many materirials in 1 m3 concrete
what is the least-count of plane- table,dumpy,theodolite,compass,tachometer?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
17. What is the thing that can disappoint you while working for a certain employer?
what is mix design
What is the technical name for aggregate stored in trepizoidal shape near railway station.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)