Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the Oneday Productivity for 1 Skilled Carpenter and 1 Steel fixer?

Answers were Sorted based on User's Feedback



What is the Oneday Productivity for 1 Skilled Carpenter and 1 Steel fixer?..

Answer / mahesh

Shuttering 5Sq.m
RCC 140kg

Is This Answer Correct ?    0 Yes 0 No

What is the Oneday Productivity for 1 Skilled Carpenter and 1 Steel fixer?..

Answer / pravin bhakta

2.2 hr/m^3

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

How much for the BRC lapping in full yield and half yield < and which table to get it ?

0 Answers   Engtex,


What is difference between load bearing structure and frame bearing structure ?

2 Answers   Sathiapal Engineers,


how much tempareture are required to make liquid state of pid leed

0 Answers   IVRCL,


where does the hinged action while designing the strture

2 Answers   DLF,


What is cutting Length of stirrups of a beam 300mm*300mm.

3 Answers  


Types of pipes?

6 Answers  


Why are steel plates inserted inside bearings in elastomeric bearing?

0 Answers   Bechtel,


DEFINE M30 GRADE CONCRETE. FROM THIS QUESTION WHAT; "M" & 30?

7 Answers   Descon, Northstar Homes,


what is the dimensions of river sand truck trailer or trolly ?

0 Answers  


Why camber is provided?

2 Answers   G R InfraProjects, Tata Steel Limited,


Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.

0 Answers   Sail,


From which end do you start deshuttering in a) cantilever portion b) simply supported portion

3 Answers   ITC Infotech,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)