If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Answer Posted / cherry
we have to calculate the date that the next day of cube catsting is.29th day
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is flexible and rigid footing?
what radial pressure, the NP2 class rcc pipe can sustain?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What are wooden shingles?
why we are using stub column..? is it possible to construct steel stub column..?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
What is the diff between cad & cadd?
How many types of slabs are there & how to design it?
What happens to Load at yielding ?
what is right & short method of measurement of slab&beam
What is the cost difference between site mix and ready mix concrete per cubic meter
what is difference between fluidity and workability also how palsticizer works
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance