If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Answer Posted / cherry
we have to calculate the date that the next day of cube catsting is.29th day
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
how do you stabilize a waterlogged area in road construction
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Design a rectangular channel.
Where is the worlds longest elevator and how long is it?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
What are the important hardware systems used for cad?
How to find CN by using arcgis 9.3?
What is construction mitigation management?
Which Types Of Bricks ?
What is componsation
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
in one SQM plaster how much Cement and sand consumed in ratio 1:4
what is raft foundation