Answer / narayan rijal

massive structures like bridge piers beams and abutements with water training heavy dams

Is This Answer Correct ?    8 Yes 0 No

In what construction is concrete grade m35 used?..

Answer / ch

foundation

Is This Answer Correct ?    10 Yes 8 No

In what construction is concrete grade m35 used?..

Answer / htc.qc

In myanmar, Grade-35 mpa most use in Bore piling concrete.
I think this is depent on construction project.

Is This Answer Correct ?    2 Yes 0 No

In what construction is concrete grade m35 used?..

Answer / mohit kumar

Heavyweights construction like dam refining. Plant etc

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum

3 Answers   Arma Group,


What does 'M' stands for in M24 bolt ?

2 Answers   Rites,


What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

0 Answers  


What is softsoil? what kind of foundation?

10 Answers   BSR,


how to calculate required shuttering material like props,spans,plates ..etc for a slab?

1 Answers   NCC, Shoba Devlopers,






what is difference between design mix and nominal mix,where the design mix is used?

2 Answers  


Niti Aayog has recently chalked up an action to help India achieving _____ medals in 2024 summer Olympics after dismal performance in 2016 Rio Olympics? A)20 B)30 C) 40 D)50

1 Answers   HPSSSB,


Brick size ? & 1 square feet brick work for use brick

1 Answers   Ashoka Electricals,


water leak detection system question & answer

0 Answers  


In earth work 1300 cum soil how to calculate how many liters require in water

0 Answers   L&T,


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

0 Answers  


Middle point of any slab is raised 10-12 mm during shuttering work because––

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)