L&T APFC Relay model etacon L8 fault:
Initial power factor is 0.6
when capacitor is on, the value of power is getting down,
please let me know the reason and rectification details.
Answer / ramesh
L&T make etaCON L8 CAPACITOR BANK plant running time pf ok, plant shutdown time using 50nos tube light load pf 0.257,The capacitor bank not in service, programme procedure connect capacitor 5kvr
| Is This Answer Correct ? | 8 Yes | 0 No |
Thermocouple connections must be taken into account to ensure a high degree of accuracy. True False
why we use chopper circuit in TV ?
comparision between fet and bjt
what is the maximum delay gnerated by 555timer and why?
write an 8085 assembly program to swap two numbers without using a temporary register
7 Answers American Megatrends, TCS,
What are the two basic modes in which the 555 timer operates?
why e1 capacity 2048 define details?
What is the difference between FDD and TDD?
What is working principle of profibus?
WHAT TYPE OF GKS ASKED?
What is meant by linearity?
for what purpose antenna is used in communication system
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)