L&T APFC Relay model etacon L8 fault:
Initial power factor is 0.6
when capacitor is on, the value of power is getting down,
please let me know the reason and rectification details.
Answer Posted / ramesh
L&T make etaCON L8 CAPACITOR BANK plant running time pf ok, plant shutdown time using 50nos tube light load pf 0.257,The capacitor bank not in service, programme procedure connect capacitor 5kvr
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What are the two methods of control in ac voltage controllers?
sir, pls send me 5 year previous question papers of RRB- Junior Engineer-GrII to my mail id
wath is this mining of hlr
What is an amplifier?
What are different categories of antenna?
What is the function of BB2F card?
write test cases for cases
Is there any junction in conductor?
what should I refer for examination of BSNL-TTA. Please suggest me good reference...so that I can clear this exam.
what is the maximum delay gnerated by 555timer and why?
for linear polarisation antenna how do u measure polarisation?
write a program to set all flags in 8085?
What is snooping cache?
I am stuck up with a question on appending of two arrays
I am writing the code for the same, I am appending two
strings this way
int main()
{
string s1 = "Welcome to C++";
string s2 = "C++ improves the logic ability";
string s3 = s1 + s2;
cout< Explain the difference between circuit switching and packet switching?