L&T APFC Relay model etacon L8 fault:
Initial power factor is 0.6
when capacitor is on, the value of power is getting down,
please let me know the reason and rectification details.
Answer Posted / ramesh
L&T make etaCON L8 CAPACITOR BANK plant running time pf ok, plant shutdown time using 50nos tube light load pf 0.257,The capacitor bank not in service, programme procedure connect capacitor 5kvr
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is meant by fm control in a dc chopper?
What is the percentage i get to work in MICROSOFT
please explain the meaning of "In GSM only 30 or 35 peoples can call at at time in a singal carrier but In CDMA apprx 70 peoples can call in a singal carrier at a time."..........
Compare csi and vsi?
Explain the difference between plc and dcs control system?
What do you understand by reverse saturation current of a diode?
Is it possible to calculate a voltage for microwave energy generating in oven? Is there any formula relating frequency and voltage and it should be independent of speed?
Draw and explain a mod-10 counter.
What is pulse width modulation?
i having one cisco 2950 switch,but i having no rights of ythis switch,now i want to know switch macc addrerss of particular network ip,how can i resolved?
The linearity error for a digital input is indicated by what???
What is fm.
Explain Speech Coding.
What do you mean by operating point?
What is meant by dc chopper?