How to calculate the condensate values of boiler?
Answer / prathab
cement consumption in plastering work
Plastering work
cemnt sand Total
Mortar 1:6 = 1 6 7
Length = 1 m
Height = 1 m
thickness = 12 mm
Toal area = 1 sqm
Total volume = 0.012 cum
Volume of mortar = 0.001714286 cum
The voids of sand we nead 20% extra material = 0.002057143 cum
Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum
One bag cement = 0.0347 cum
2 Quantity of cement required = 0.071140387 Bag
= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148
| Is This Answer Correct ? | 0 Yes | 0 No |
when measuring flow of liquid what are the two things to measure
why we are maintain boiler ph 9.0,not maintain 10.0 or 11?
What is iiucr in relation to petrol engine ?
ONE TURBINE HAVING THREE EXTRACTIONS AND ANOTHER HAVING ONE EXTRACTION WHICH TURBINE IS MORE EFFECIENCY?
• Which is the latest one?
What does Nominal size in a valve means like NG6,NG10 etc
how water get evaporated in cooling tower
Cantelevar beam having a point load at free end having SFD is
• Have you previously successful in this position progressed to within the company you have worked with?
Purpose of evaporator in refrigeration system.
0 Answers RRB, Terram Geosynthetics,
Purpose of governer in automobile?
MEIL Company written test questions
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)