cement consumption in plastering work
Plastering work
cemnt sand Total
Mortar 1:6 = 1 6 7
Length = 1 m
Height = 1 m
thickness = 12 mm
Toal area = 1 sqm
Total volume = 0.012 cum
Volume of mortar = 0.001714286 cum
The voids of sand we nead 20% extra material = 0.002057143 cum
Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum
One bag cement = 0.0347 cum
2 Quantity of cement required = 0.071140387 Bag
= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain difference between fissile and fertile materials?
What is meant by payload for aircraft?
What is the maximum P-max for a cylinder in M/E.
composition of cast iron fc-500,fc-550,& fc-260 which is use in sheet metal industries as a piller set
What are the things to do when approaching the port?
Gegger is used in foundry for the purpose of____________
what is procedure of measuring operating length of mechanical seal .(in case of centrifugal pump)?
"What is the remedy if due exchanging, valve broke out during engine running operation?"
Which heating value is indicated by a calorimeter and why ?
describe a type when u anticipated potential problems and development of preventive measure.
What are you going to inspect or check when you open the crankcase?
In Rankine Cycle we use the concept of Tm(mean temperature of heat addition).In actual cycle the efficiency comes as n=1-T2/T1 Taking Tm into consideration it comes as n=1-T2/Tm as T1>Tm so the efficiency for both case will not same for a same cycle. Can anybody explain how it is possible? Advance appreciation for your effort.Thanks
What is the difference between EN 8 and SS410 grade material with chemical composition and application.
What are the defects in exhaust valve?
What is the mechanical advantage of a double pulley?