How to calculate the quantity of cement,sand,aggregate for the area L*B*T
are 15.24 m*21.36m*0.12m in the ratio 1:2:4
can any ine explain in detail by using formulas.
Thanks in advance

Answer Posted / karthik rajendren

Volume of Concrete = 15.24*21.36*.12 = 39 Cum
For 1:2:4 , Req.Cement Bag = 6.46 Bag/Cum , Sand = 0.44 Cum
, Agg =0.88 Cum.
For total Requirement,Cement = 41*6.46=264.86,Sand =
.44*41=18.04Cum,Agg=.88*41=36.08 Cum

(5% wastage's for Concrete is considered)

Is This Answer Correct ?    9 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1885


How much cement and water required for cement selery????

1434


how much quantity of cement,sand and water required for 1 sq feet flooring work .

2004


what is mc arther pile?

1787


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

7901






do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

1255


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1228


Civil engineering related

1529


to minimize budget cost of building , what can i do

1677


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1554


In jack arch floor, the rise is kept?

720


Describe the advantages and disadvantages of using plastic and timber fenders?

678


how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

2018


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

1944


3. What are the disadvantages of your present job, things you do not like about it?

2297