Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what do you mean electrical earth pit?

Answers were Sorted based on User's Feedback



what do you mean electrical earth pit?..

Answer / 7anoter4

Usually a vertical grounding electrode –made of copper,
copperweld steel, stainless steel or else-and length of 3-20 m
is driven in earth and the upper end will be exposed in a pit
covered by a lid- about 0.3-0.6 m deep and 0.3 m diameter.
This pit facilitates electrode connection with horizontal
grounding conductor and as a check point of electrode state-
grounding [earthing] resistance measurements and other.

Is This Answer Correct ?    3 Yes 0 No

what do you mean electrical earth pit?..

Answer / er. s.manimaran b.e(eee)

it is longest copper bar which is burried into earth .and
its connected to main earth wire of utility.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is the difference between Generator Differential Relay and Transformer Differential Relay?

0 Answers  


11 kv line me tino phase takra jaye to present time me approximately voltage aur current kya hoga...

2 Answers   Electrical, Electrical Tech, Videocon,


what is the design voltage for 6.6KV 2000 KVAR HT capacitor?

1 Answers  


Which of the following plant has less plant factor ? -Nuclear -Hydro -Diesel -Pumped storage

1 Answers  


tate and explain super position theorem

2 Answers  


why told ' x ' mer to transformer

1 Answers   Electrotherm,


A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE TO FINISH THE WORK IS 1.11 2.21 3.28 4.42

3 Answers   Ramky,


why we are discharging h.t supply during shutdown time

1 Answers  


Why is transformer core is earthed

3 Answers  


how is classified voltage level in generation,transmission & distribution system?,

7 Answers   Adani,


how to select the surge suppresor for the 33 KV supply and what will be the rating, selection guide

1 Answers  


How many types oil using in transformer ? How many letars using in transformer..?

0 Answers   TATA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)