Answer Posted / gannon
The mix of Cement & Water is known as Paste.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
how to calculate the weight of concrete
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
Explain what is zoning permit?
sir, whitch is the best book (writer name) for prepration of gate....
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
explain the advantages of total stasion
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what are the types of design? which type of method is used at what type of design & why?
What do you mean by tolerance factor of concrete ?
how to calculate the steel in 500yard
What is proportion of PCC Grade G?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
WHAT DLC DESIGN IN CONSTRUCTION