Why we provide chair for slab reinforcement? How to place chair distributors to distributors or top distributors to bottom main?
Answers were Sorted based on User's Feedback
Answer / ajay saini
there are many functions of chairs in reinforcement.
1. it maintains the gap between the two bars.
2.it supports the bars.
3.it increases the strength of the structure and maintain the tension in RCC.
4.it helps to prevent the fear of building collapse due to the failure of compression and tension zone.
| Is This Answer Correct ? | 58 Yes | 0 No |
Answer / s.prabaharan
Actually chair rod is provide for keeping space for bottom distributor rod & top distributor rod.
| Is This Answer Correct ? | 49 Yes | 4 No |
Basically Chairs is provided in slab and flooring work for maintain spacing in top layer jaali & bottom layer jalli for avoiding of collapse of bar when castion work is start.
| Is This Answer Correct ? | 19 Yes | 3 No |
Answer / b s sushmita
Chair rods are nothing but just enabling rods that help to maintain the proper space between the bottom and top reinforcements of a slab.
They dont carry any load and they need not be given special care. It has to be placed as one number in one sqm.
| Is This Answer Correct ? | 10 Yes | 1 No |
Answer / v.k.nanda
How many no. of chairs required in one SQM ?I'm not able to get answer to this qyery. Kindly clarify.
| Is This Answer Correct ? | 11 Yes | 2 No |
Answer / mohammad danish makrani
Generally , chairs bars is provided in rcc raft foundation and also in rcc slab for keeping distance(separation) b/w bottom reinforcement mesh and top reinforcement mesh. we can say that its is supportive nature and also maintain spacing. and hold the upper reinforcement and resist the compressive stress. minimum dia. of chair bar is 10/12mm. Thanks
| Is This Answer Correct ? | 0 Yes | 0 No |
quantity of cement required for M35 grade reinforced cement concrete
Define What are the reasons for geotechnical site investigations in Uganda?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
What is the diff. Between rectangle & parallelogram?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
you are a civil engineering student so what you have done to improve your knowdge
can any one tell me how to estimate the reforcement of circular slab and also for dome.
How to Calculate the spacing of bars if we use 12 mm dia. bars instead of 10 mm dia. bars. Whereas the 10 mm dia. bars spacing given 0.250 as pr drawing. ?
what is mean by compressive strength
what is 43 & 53 in cement
How to calculate the crank length of the rod in beam? Please give me a details.
How do You Maintain a structure after getting cube test of low strength.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)