neutral axis more than the critical neutral axis then
rainforcement in rcc beam belong to over or under
rainforcement
Answers were Sorted based on User's Feedback
What is the difference between Fe500 and Fe500D rebars in their appearance and also is there any change in their Yield Strength of these rebars?
how to calculate the quantity of bricks
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
What is the minimum size of the particles of silt soil?
in M20 Mix concrete how much cement, sand and 20mm metal?
how much length will be deducted when a reinforcement steel bending?
why we are condecting the slump test for concrete?
What is labour ratio for construction of residential buildings
why are use steel with conc. instead use of other type materials.
4 Answers College School Exams Tests, Prathima Group,
What is the weight of 10mm,20mm,40mm aggregate per cubic
how to do soil testing briefly with details
is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)