In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
Answer / sjtbehera
one after another is not a big thing. one mould cam complete
in 3 minutes. that is not big diffidence in strength
Is This Answer Correct ? | 1 Yes | 0 No |
1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
what is super elevation?
If in school there are 1800 students and 80 staff how much water can be used by them per day?
why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarification???
Explain what is zoning permit?
How can you distinguish between sorption, absorption and adsorption?
how to find the percentage for minimum reinforcements as per IS:456 for beam , column, slabs.??
what is the quantity of cement( in bags),sand and aggregates required for 1 cmt of M 25 concrete
what is the wight of 4"/6" solid block?
Water absorption for stone and first class stone bricks?
How many no of bricks form 1 cum? How many no of solid blocks form 1 cum?
what is civil engineer greatest strength and weakness?