In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
Answer Posted / sjtbehera
one after another is not a big thing. one mould cam complete
in 3 minutes. that is not big diffidence in strength
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
why we create short columns under grade slab?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
How to do bbs in excel format
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
Define the various stages of the project planning process in construction.
Why the statue of liberty is made of copper?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
how to calculate mivan shuttering matrial
Who designed the city of washington dc?
How many Sft of Level Plaster per Kg
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
calculate the quantity of water for 1:6 cement mortar
Slump Values for works?
what is project?