how much steel is required foe following components..
footing-
plinth beam-
column-
beam-
slab-
Answer / sjtbehera
footing-2.5%
plinth-3%
column-2%
beam-2.5%
slab-3% of toal cum
| Is This Answer Correct ? | 3 Yes | 5 No |
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
why do you desire to change from your current position?
WHAT IS THE UDL OF TOWER CRANE?
what is the weight of 12mm aggregates?
how to calculate quantity of bricks in circular manhole with examples.
what,s the clear cover of beam,slab,column,lintel and foundation?
36 Answers Max Myanmar, Spar Geo Infra, Yashwant Construction,
coarse sand has a fineness modulus in range of
strenth of brick
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
What is meant by Anchorage length? Development Length?
how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?
how much length will be deducted when a reinforcement steel bending?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)