what is plum concreting and how is it can be done what is the
ratioo of rubble and concrete
Answer / azam
40% - rubble
60% - concrete
Generally it's done in flat footing foundation by placing the rubble and concrete as mention above ratio without and gape between them.
| Is This Answer Correct ? | 4 Yes | 0 No |
What was asked in isro civil interview
what is meant by GANTRY GIRDER?
what is the service corridor?
what r the precaution for high in atp tempareture,low in atp tempareture
Advantage of Aluminum form work in terms of activities can be skip and cost too
what is the difference between onw way slab & two way slab?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
( mean sea level )for which activity we will use this statement?
What is the diff between cad & cadd?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
how many shuttering material required for 1000 sq.m built up area.
Fly ash is residue generate from??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)