Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between Backfilling & Refilling in
Earth Work Group Item ?

Answer Posted / gopi

back Filling:
after completing foundation or any structure,doing that gape filling or extra area
Refilling:
temporary or wrong excavation filled all excavated area

Is This Answer Correct ?    4 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1958


will fix foundation bolts at site with out template is there any procedure?

2687


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2640


Why steel rods are produced only in even dimensions?

2687


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

1887


what is the steel difference between np-2 and np-3 pipes and weight also

2182


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

2658


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

2156


Define different types of roof systems?

1242


How can we make a hole in a solid rectangle using solidsworks?

1335


How is calculate the cube molt

2320


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2288


very simple or less time consuming formula for reinforcement calculation by moment

1523


what is the difference between replacement of cement by groundnut shell ash

3274


residential buildings,mixing of concrete,structural,construction material,site handling.

2528