What is the difference between Backfilling & Refilling in
Earth Work Group Item ?
Answer Posted / gopi
back Filling:
after completing foundation or any structure,doing that gape filling or extra area
Refilling:
temporary or wrong excavation filled all excavated area
| Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
What is gravity flow?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
how many time use of plywood shuttering and IS code
2. What are the advantages of your present job, things you like about it?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
What materials were used to build the golden gate bridge?
how to convert sand in Cft to Kgs
What is horizon or horizontal mining?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
What applicable rate of wct in bihar
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton