Three men A,B,C can complete a work separately in some
specified days(may be6,7,8).If they do the work together by
alternate days. Then how many days need to complete the
work?
Answers were Sorted based on User's Feedback
Answer / umesh7a
Three man's on day work = 1/6+1/7+1/8=73/168
three man's can complete the work in 1/73/168 days
= 168/73 days
Now if they works together fro the alternet days they will
complete the worksin 2*168/73 days
(If three mans working for the alternate days then work
completion time will be doubbled)
| Is This Answer Correct ? | 14 Yes | 3 No |
A car is filled with 4.5 gallons of fuel for a round trip . Car is taken 1/4 more than in going than coming up. What is the fuel consumed in coming up ?
There are some houses in a street back to back .And they that house behind 10 was 23. How many houses in the street?
In 1000 wine bottles stack 10 are poisoned given 10 rats what is the minimum number of tries to find the poisoned one. Rat dies once it licks the poisoned wine.
11 Answers Google, IBM, Infosys, KPIT, Yahoo,
what is ment SEBI?
IF 3+4=25 AND 4+5=41 Then 5+6=?
Factorize y**2 + 8y - 48 =0
The sum of 5 consecutive integers is 35. how many of the five consecutive integers are prime number
One rectangular plate with lenght 8 inches, breadth 11inches and 2 inches thickness is there. What is the length of the circular rod with diameter 8 inches and equal to volume of rectangular plate?
A beats B by 10 meters and B beats C by 15 meters the A beats C by
give model questions
aptitude questions
1 Answers HCL, Solartis, TCL, TCS, XL Dynamics,
194 base 10 = ____ base 5