IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND
&CONCREATE&CEMEBT
Answer / manish kumar
signal work depend upon road traffic condition
| Is This Answer Correct ? | 0 Yes | 3 No |
why mixing marble powder reduces setting time of cement
Which is stronger solid steel rod or hollow steel pipe?
how many size of electric cable, who used in Building & how measurment this material ?
length where bent up is made in slab of bridge from one end
Unit weight of brick? Sand? Aggregate? Steel? Cement? Water?
28 Answers Aliens Group, Cemplex, DLF, L&T, LBC, Power Trade Engineering, Vishnu, VKM,
how to prepare Steel schedule or Bar bending schedule.
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for 1 cumtr.
What is softsoil? what kind of foundation?
at what pressure ply-wood is obtained by gluing wooden sheets
How will find compresive strenth of M20,M25,M30 after 7day,8day 28day etc please drive step by step not shot?
how to calclate the cemment for 1 cubic metre of 1:2:4 concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)