Anybody know how to create a ladder programme for power
switch in TV remote without using counter... ie TV can be
turn on and turn off using single push button switch... on
pressing the switch first time TV turn on and hold the on
state till i press the switch again, and after TV turn off.
Answers were Sorted based on User's Feedback
Answer / mohanapriya
npn transister can be designed to solve this problem.
| Is This Answer Correct ? | 0 Yes | 3 No |
What is loop checking ?
10 Answers Kharafi National, Petrofac, Samsung,
how checking is done in fiber optic cable? explain the working of RTU?
Please why do we use 4-20ma in instrumentation engineering
Sir, I am working as a Instrument Engineer in Grasim Industries. Can any body provide question answer for interview purpose
How to measure high frequency using thermistor
Is it possible to convert 4 wire transmitter to convert to 2 wire with additional relay.Please send detial with drawing,i will appreciate.
what is a boiler tube leakage detector? ... what is the working principle ?
generally for transmitter we are giving supply 24vlts?but we are getting output 4-20ma ? how it is possible? is there any operation inside the tx?pls give complete information?
kindly tell where orifice,nozzle,air foil,ventury used in flow measurement?
How we calculate orifice plat size???
What is the deffernce bet. Instrumentation and Electrical Enginerring?
what is absolute pressure, gauge pressure and atmospheric pressure?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)