Is it recommended to apply H.pot test for new cables
segments after terminations or joints, however, this cable
has been tested before at the manufactor by the vendor ? or
only we can apply megger tests ?



Is it recommended to apply H.pot test for new cables segments after terminations or joints, howeve..

Answer / sudhakar g

Hpot is the test we can do if any cable damage happend or any leakage of current....Every cables must be tested before they sent to consumer and the test certificates also provided when ever we buy that product....Before terminated to any transformer or panels or any equipment...We have to do the megger test because if there is any cable damage while we are laying the cable....If you go for high rise buildings it is recommended use Rising main, you will tap the supply from the Rising main and main advantage is voltage drop is not occur compare to cable laying.......

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What happens with squirrel induction machines if the ends of rotor conductors are kept open? Explain

5 Answers  


Explain the working of any one cutting machine

0 Answers   Mahatma Gandhi University,


why PT transformer primary r the grounded?

2 Answers   L&T,


area control error

0 Answers  


orifice sizing how done, checking & selection

0 Answers  






in an ac series circuit there are 30 bulbs are connected in a serial set.what will happen if one bulb is fused and we removed the bulb and reconnect with the remaining bulbs? (29 bulbs). will the brightness of other bulbs increase or not?

3 Answers  


How to reduce power factor correction capacitors failure in an industrial environment with vsd and computers usage in the system

2 Answers   ABB,


What is full form of ELECTRICAL?

3 Answers   Changwoon, DP World, Electrical, GSS, HCL, ITI, L&T, Maruti Suzuki, MCC, SMR, Somany Ceramics, TRDP, Wipro,


What is the difference between split AC and Casste AC?

2 Answers   NTPC,


On what basis the the size of Lightning arrester for buildings are selected ?

0 Answers   KGD,


When and where resistance earthing is used ? How to calculate the time constant for earth fault

0 Answers  


whether choke act as a voltage regulator in tubelight or not?

1 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)