what if tie beams coming from x axis do not meet tie beam
coming from y axis? Is it safe if they dont meet?
Answers were Sorted based on User's Feedback
Answer / umar farooq
ITS NOT SAFE , TIE BEAM IS REQUIRED FOR JOINED THE COLUMN,SO TIE BEAM MUST MEET EACH OTHER .
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / kunal saxena
during designing da tie we consider both beams coming from x and y axis.since it is made to act simultaneously so dey should meet
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate the number of cement bags required for 1m3 of work
Name the main components of a cad gui?
what is difference between design mix and nominal mix,where the design mix is used?
percentage of wastage limits in construction materials EX : min & max . cement = fine aggregate = coarse aggregate = admixture = wood = tiles = painting = marbles = bricks =
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
what is m30 in concrete tiles
0 Answers Interex, Raj Construction, Spago,
I need to constructive work in amaraj batteries
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?
How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete
Concrete Mix designs for M15,M20,M25,M30 and M35
23 Answers Arelgee Consultants, ATCO, Fusion, Gammon, Power Cable, Raushan Engineers, Simplex,
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)