what if tie beams coming from x axis do not meet tie beam
coming from y axis? Is it safe if they dont meet?
Answer Posted / kunal saxena
during designing da tie we consider both beams coming from x and y axis.since it is made to act simultaneously so dey should meet
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
what is cement wastage percentage in NHAI ROAD WORKS
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How much quantity of rod binding work by a rod binder per day
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
why do we provide haunches in rcc box or underpasses?
PL.tell me about civil engineering questions with answer
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building