During Testing of Maintenance Free Earthing, How deep should
be the Spikes of Earth Test Meter should be inserted in the
soil(one spike is 15 Meter & Other spike is 30 Mtrs away
from the Main Earth Electrode. Because, recently, we
observed that when spike is inserted 3-4 Inch in the earth-
results are better, If spike is inserted 1 feet deep than
results are increasing.
No Answer is Posted For this Question
Be the First to Post Answer
why threre are two parallel lines in transformer's symbol?
How many methods use the load flow solution?
IN 500 KVA TRANSFORMER 11KV/415 VOLTS HOW TO CALCULATE THE HT CABLE SIZE AND LT CABLE SIZE FROM TRANSFORMER TO LT PANNEL. AND HOW MANY MAINSWITCHES OR MCBS WITH RATING ARE TO BE PROVIDED
Is there any capacitor in 3-phase IM?why,xplain.
how convert kvar to microfarade? circuit diagram of infrared transmiter and receiver? circuit diagram of Fm transmiter and receiver?
why we use ac system in india why not dc
when a machine act as genartor and as motor?
battery spicgravity mesuserd?
I have cleared IOCL written exam(Electrical). My intv is on 6/9/2008.can anyone guide me & tellme abt intv questions.
What is the formula for calculating impedance of transformers connected parallel at fault level 50KA?
What is meaning of DRU in gen.of AVR.
How much inductance or resistance require as a starter in series with induction motor of specific capacity(e.g. 5 hp) ? What is formula for it ?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)