During Testing of Maintenance Free Earthing, How deep should
be the Spikes of Earth Test Meter should be inserted in the
soil(one spike is 15 Meter & Other spike is 30 Mtrs away
from the Main Earth Electrode. Because, recently, we
observed that when spike is inserted 3-4 Inch in the earth-
results are better, If spike is inserted 1 feet deep than
results are increasing.
No Answer is Posted For this Question
Be the First to Post Answer
I have 380.KVA DG set how to Calculate the units from DG.
2 Answers Ozone Pharma, Sperry Plast Limited, Sterling,
what are the main applications of transistor in non-linear region?
do any one help me to get "C" license,, i have doubts ,,, if mediators ter pls call me,, my no is 8056640042
what is d check in dg 1500kva
which transmission is cheaper ac or dc?
why we have to particulary use ACB for below ratings,even available of MCB,MCCB with that range ?
What is the meaning of C1, C61, C91 cable
THERMAL CAPACITANCE IS MEASURED IN..................................................
What Should be the rating of transformer used in 33KV substation?
it is possible to rotate the DG engine dc starter with wrong polarity connections? why?
Caliculate the Specific Fuel consumption of 320 kva diesel genarator set?
100V supply is appllied between 500K Resistance bulb. for 1 kwh energy, how long time the bulb will glow? explain the calculating method.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)