IN 500 KVA TRANSFORMER 11KV/415 VOLTS HOW TO CALCULATE THE HT
CABLE SIZE AND LT CABLE SIZE FROM TRANSFORMER TO LT PANNEL.
AND HOW MANY MAINSWITCHES OR MCBS WITH RATING ARE TO BE
PROVIDED

Answers were Sorted based on User's Feedback



IN 500 KVA TRANSFORMER 11KV/415 VOLTS HOW TO CALCULATE THE HT CABLE SIZE AND LT CABLE SIZE FROM TR..

Answer / sudhakar g

First you have to caluclate the load of the T/F i.e
KW=KVA*p.f
KW=500*0.8=400KW
I=kw*1000/1.732*415v*0.8
I=696.74 A
Based on these we can choose the Cable size ....
suppose the LT AL cable of 3.5c x 400 sqmm will give 530 A
of polycab....if we go for two runs of 400sq.mm means it is
good and the breaker size we will go for 800A ACB bresker
means it is good....

I am taking Electrical desining classes in Bangalore...It
will be usefull for designing as well as site engineers
those who are intrested to go for Electrical
Engineers....we give you indepth knowledge of Load calu,
Cable sizing, Lighting cal, panels, breaker
selection,Autocad drawing....if any body intrested means
pls call to +91-7760362623 or sudhakar28485@gmail.com

Is This Answer Correct ?    17 Yes 13 No

IN 500 KVA TRANSFORMER 11KV/415 VOLTS HOW TO CALCULATE THE HT CABLE SIZE AND LT CABLE SIZE FROM TR..

Answer / brijesh kumar

kindly give full answer

Is This Answer Correct ?    7 Yes 6 No

Post New Answer

More Electrical Engineering Interview Questions

WHAT IS THE FORMULA FOR CALCULATING CURRENT RATING(DIRECT IN GROUND OR AIR) OF ARMOURED(XLPE) CABLE OF 4C,16Sqmm?

0 Answers  


WILL THE PERCENTAGE IMPEDENCE FOR A ONAN TRANSFORMEER BE THE SAME COMPARED TO ONAF TRANSFORMER OF SAME RATING???

5 Answers  


kva/kvr

2 Answers  


what is ripple ??? what is harmonics ?

3 Answers   ABB,


at the time of starting back emf of a motor is zero.so how can it will start to run??

1 Answers  






what is the meaning of 16/20 mva of transformer

7 Answers   JSW,


what is raw power & normal power

2 Answers  


how capacitor buield up the voltage

3 Answers  


wat do knw aboot circuit breakers ?

9 Answers   IOCL,


how to write program by ladder logic in case of PLC operation

3 Answers   Gridco, Sofcon,


how we sesign the transformer give some specifion regarding design of transformers

0 Answers  


why the check zone and main zone are used for Busbar Protn. scheem?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)