The difference between Centering & Shuttering is –––
Answer Posted / roni paul
Centering term is used for Curve portions...
and shuttering term is used for Horizontal portions...
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
what is flashing?
how can we calculate steel value, depending on load
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
what is the difference between prime coat and tack coat in road construction
use ofr concrete as per grade ?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
what would be the design load of R.C.C Cooling tower per cell.?
Floor tile measurement? Wall to wall or skirting to skirting
Explain what is structural frames or systems?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.