Current will flow through the water. If the wires ar close
enough it will cause an overload. If they are far enough
apart they will heat the water and can make the water boil
between the wires.

This method has been used to load test DG's. 3 pointed
metal plates are fixed onto a triangle of wood and a phase
connected to each. When the plates are lowered into the
water current will flow through the water. The further the
plates are lowered the greater the current.

Note that this is very dangerous if great care is not taken
and all people are kept away from the water.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is relation between motor poles & motor current in 3 phase motor

1 Answers  


HOW TO FIND THE PRIMARY AND SECONDARY OF TRANSFORMER(IN OFF CONDITION) USING MULTIMETER? IS IT POSSIBLE FIND BY SEEING RESISTANCE???

4 Answers   Areva,


how do i work out the Amps of a incommer if i am running 1 37 KW motor and a 0,75 KW motor and some solinoids

0 Answers  


How to select Main CB Rating for 187 KW Load?

6 Answers  


what is kvarh? Please difine it With calculation

3 Answers   GM General Motors,






Three set (each phase contain 2 cable of 400 mmsq CU XLPE AWA) of single core cables are connected to 11 KV motor of 14 MW & the switch gear supplay is taken from 11kv feeder & this supplay taken from 275 KV substation. Problem is one pair cable(L3- 2 cable ) getting very hot & gland melted and damaged in switch gear side. the other two cable haven't any more hot(ambient temp only & L3 haveing 95- 100 Degree C. The same problem happened in 275 KV substation switch gear side also where the supply taken for 11 kv switch gear. But here L2 phese cable had problem. Why it is happening like this?. The cable having temperature different at different location from gland side inthe case of 11KV feeder of 275 kv substation. why ?

2 Answers  


IS RTCC AND OLTC REQUIRED FOR 500 KVA 11KV/433V TRANSFORMER FOR AN INDUSTRY?

7 Answers   IGCAR, TNEB Tamil Nadu Electricity Board,


Do any one know exacatly when the results for NHPC held on 8th march 09 for engineering trainees will be released ?. if so please post it, i'm eager to know it.

0 Answers   NHPC,


in an ac series circuit there are 30 bulbs are connected in a serial set.what will happen if one bulb is fused and we removed the bulb and reconnect with the remaining bulbs? (29 bulbs). will the brightness of other bulbs increase or not?

3 Answers  


what is conductor constant of raccun conductor

0 Answers   CSPDCL-Chhattisgarh State Power Distribution Company Limited,


For refrigerators the motor current is raised beyond its rating on both conditions when the voltage of the system is more(say 270v) than the rated voltage(220v) as well as when the voltage of system is less(say 160v) than normal voltageof 220v, why explain?

0 Answers   Electrical Tech, UPSE,


A system absorbs 100 k J of heat and the increase in its internal energy is 100 kJ; the work done is

0 Answers   Caterpillar,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)