hi... how to find reaction in continous beam 4 different span
?
one MT of steel for using how much binding wire required?
standard sand use?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
how much least count of levelling ?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
what is the effect of earthquake on rcc columns & foundations?
The compressing strength of concrete samples (cubic)
sir please send me campus placement questions in civil engineering
for brickmasonry strengthwise which bond is better?
What will you do if you encounter problems like accidents?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
0 Answers AIZAZ General Contracting General Maintenance, GK Realtors,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)