Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How can we design MEP services for Commercial Building in
area about 22 Acres of land?



How can we design MEP services for Commercial Building in area about 22 Acres of land?..

Answer / shiva

MEP design will be majorly three parts.

Electrical:

Load to be calculated after approval of the client. then the cables, panels, lights to fixed.

Plumbing

There are two types here. 1. Water supply system and 2 Drainage system.

ACs - if any

Fire protection system.

Is This Answer Correct ?    11 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what are the effects on an power plant and consumers if the power factor is increased or decreased?

2 Answers  


Explain the advantages and disadvantages of thermal power plant?

0 Answers  


How can we calculate earth mat conductor size ..? & give the formula to determine earth conductor size?

3 Answers  


what is LOS(line of sight)?

1 Answers  


how to calculate transformer load?

0 Answers   Lanco,


what is the difference b/w pvc cu conductor and cu breaded wire..?

1 Answers  


presently I am working in private sector.In powergrid interview recruiter asked me why you join this organization.

0 Answers   Power Grid,


How to calculate energy stored in a capacitance

0 Answers  


How to run 1ph motor(230 VOLTS its full load amps is 4.5 ampa))with 480 volts main(we didn hav neutral)Thn we go for step down transformer.Our load 10 amps,so we conisder this amps in primary are secondary side

1 Answers  


WHAT R THE SAFETIES IN A HIGH TENSION PANEL N LOW TENSION PANEL. ALSO WAT SAFETIES R THERE IN A 200 KVA TRANSFORMER?

0 Answers  


what's the difference between 'shaft power demand' and 'BHP' , when we consider electrical load list.

0 Answers   HEC,


why there is 1 phase and 3 phase but not 2 phase and 4 phase?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)