how to calculate concrete quantity from its density or details
mentioned in rmc batch report.
Answer Posted / guest
density= mass/ volume
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What are the skills required to become an architect?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
how we calculate the grade of the Bituminous materials.?????
How much cement will require for 1Rmt Skirting laying
Explain why concrete barriers have curved surface profiles?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
what is anchorage length,lap length and (dont remember the last one)
What is limit state method and working stress method and ultimate method
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
what is civil all interview questions
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
water leak detection system question & answer
What is the purpose of Chipping in the heavy foundation?
what are the ffactors you considered choosing the course?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate