How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
No Answer is Posted For this Question
Be the First to Post Answer
Why we are not provide bar in the centre of the column and bar?
HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S MINIMUM DEPTH FORMULA.
how to calculate the number of cement bags required for 1m3 of work
how much cement consumption in 1 sqmt of wall cleading work (dedo)?
What is meant by autocad?
What height of a 3.5 m high 300 x300 mm proposed col. can be casted at a time ?
How many lap joints are sufficient in column reinforcement ?
from where ican get sample papers for CET-delhi 2012
we do not provide reinforcement bar through the centre of a column.why?
What is themeaning of TBM in civil construction
1. why steel used in concrete
why we are using 190x90x90 mm of brick size?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)