how to calculate no. of cement bags consumed in 1:4 and 1:6
proportion RR Masonary and the quantity of sand also
Answer Posted / j.edison
cement mortar1;4 1440divided by4=360kg
cement mortar 1;6 1440divided by 6=240kg
Is This Answer Correct ? | 17 Yes | 24 No |
Post New Answer View All Answers
how to disign cuplock shuttering and it's matireal requirement snd any related web site
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Floor tile measurement? Wall to wall or skirting to skirting
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Write short note on construction programme for pile foundation.
How and where are aqueducts built?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
what is the price of a cubic meter of concrete on international market?
In case if concrete box girder bridges how is the number of cells determined?
Formula for calculation volume of essentric footing
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What is the zero value in quantity surveying
how to take concrete quantity for precast segment for viaduct project?