Why Is Propping Required For Long Structures Once The Form Work Is Removed?
No Answer is Posted For this Question
Be the First to Post Answer
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
How many bricks,sand,cement in 1m3 bricks masonary
what is the lap length on column? state the farmula plz with explaination.
What is the cost of Brickwall ( 4")(1:4) thick wall total Area 245 sqft with plaster(1:6). With all materials including.
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
volume of 2 bulbs in pile of height 10' diameter 1'3''
What is the proportion of cement agg. and sand for M20,M25 and M30?
difference between specification and method of statement
how to calculate weight of round steel bar and square steel bar, i section bar and c channel bar, angle bar
If specific gravity of cement is less than 3.15 what is the cause?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)