What are the Defect Status in HP Quality Center?

Answers were Sorted based on User's Feedback



What are the Defect Status in HP Quality Center?..

Answer / sachin

The different stages of a bug is as follows:
1. New
2. Open
3. Assign
4. Test
5. Verified
6. Deferred
7. Reopened
8. Duplicate
9. Rejected and
10. Closed

Is This Answer Correct ?    17 Yes 13 No

What are the Defect Status in HP Quality Center?..

Answer / jaya

assigned
closed
deferred
fixed
new
open
rejected
reopen

Is This Answer Correct ?    6 Yes 2 No

What are the Defect Status in HP Quality Center?..

Answer / pooja

1) New
2) Open/Assigned
3) Scheduled/Delivered
4) Fixed
5) Returned/Rejected
6) Cancelled
7) Retest
8) Retest complete
9) Retest Failed
10)Retest Passed
11) Closed
12) Deffered
13) Duplicate
14) Reopened

Is This Answer Correct ?    7 Yes 11 No

Post New Answer

More Manual Testing Interview Questions

what is a bad defect and why do we write bad defects?

3 Answers  


what is meant by defect tracking system?

5 Answers   Magnum,


Who Decide Severity And Priority ?

12 Answers   British Telecom BT,


Changes and enhancements to system?

0 Answers   Infogain,


I am doing manual testing for one website application. already i had prepared test case report,bug tracking report. now i need to perform functional testing of the application and prepare function test report. so can u send one model of the functional test report to me.. it is very helpful to me. my id is sunaruna84@gmail.com

0 Answers   SoftSquare,






How can I do a documentation of Test Cases? Which steps are in it?

4 Answers  


If there is a button called Edit button. 1) Editing can be done by double clicking the object 2) Editing can be done by pressing Edit button 3) Editing can be done by pressing Alt+E key Then Should I have to write 3 different test cases for editing object? What should I do so that I 'll not miss the any functionality while testing.

1 Answers  


Tell me the Severity and Priority for the following Case. Login Page is not opening for the First Time - For Valid inputs and the login page is opening for the second time for valid inputs.....

2 Answers  


What are the contents in "Requirements Traceability Matrix" not in " Test Responsibility Matrix"?

7 Answers   EDS,


on what basis do the tester asssign severity

7 Answers   CMC,


When is Ad-hoc Testing done in a project?

4 Answers  


what is the call-pair testing? there is any length for Test case?

5 Answers   Blesso Soft,


Categories