When is Ad-hoc Testing done in a project?

Answers were Sorted based on User's Feedback



When is Ad-hoc Testing done in a project?..

Answer / ram mohan reddy

Ad-hoc Testing:It's a type of testing in which one will perform testing on the application in his own style after understanding the requirements very clearly.

Adhoc testing comes in different manner.

1)Testing without a formal test plan or outside of a test plan. With some projects this type of testing is carried out as an adjunct to formal testing. It carried out by a skilled tester, it can often find problems that are not caught in regular testing. Sometimes, if testing occurs very late in the development cycle, this will be the only kind of testing that can be performed. Sometimes ad hoc testing is referred to as exploratory testing.

2)Tester will do it after completion of the all the test cases executed and when they are going to realese the build.

3)The end user will do this type of test to know whether the application is working or not.

Is This Answer Correct ?    4 Yes 0 No

When is Ad-hoc Testing done in a project?..

Answer / me a tester

It's a random testing It maens testing a application
without proper test plan.It's carried out at the end of the
project when all the test cases are executed.To check the
application randomly.

or it's carried out in CMM 1 level company where test are
executed without planning

Is This Answer Correct ?    3 Yes 0 No

When is Ad-hoc Testing done in a project?..

Answer / shhhh......

Testers used to conduct this Adhoc testing only in the
optimal conditions. i.e its a kind of testing conducting
without having any plans in the critical and in complex
times like
when the tester is not having time to conduct Complete
testing life cycyle process then he will conduct this adhoc
testing.

Is This Answer Correct ?    1 Yes 0 No

When is Ad-hoc Testing done in a project?..

Answer / prathima

Due to lack of time or lack of knowledge on project the
test engineers group with senior people and do informal
tessting without following any test plan.
In these cases the adhoc testing is carried out

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

What is the testing process and what testing process followed by software company?

2 Answers  


plz send test scenarios and test cases for "user name should have vowels only with the range of 4 to 8 characters"

2 Answers   Infosys,


what is difference b/t severity and priority

4 Answers   Tech Mahindra, Value Labs,


I have 2 years of exp. in testing and looking for a change if any body knows, about any vacancy in testing then plz contact me on deepti_ac@yahoo.co.in

8 Answers   Wipro,


What is agile testing ? how can we perform agile testing ?

0 Answers  






I am sujili(frm chennai) new commer for this site? I have some doubt's pls clarify it..... I finished my B.Tech 2004 pased out(CSE),(sujli2000@yahoo.com) and S/w Testing Course(2007) Now iam serarching a job in Testing, I did not have any experience in real time projects. Any body can send me the sample Testcases,Srs,for Banking,ERP Projects etc.

3 Answers  


What is private and public bug in test plan?

1 Answers  


What will be your approach if a particular script in Load Test fails?

0 Answers  


Can any one Explain what is Impact Analysis?

3 Answers   IBM,


Being an Manual tester, what will be the role or activity in test plan ?

0 Answers  


.what are the types of recording modes in winrunner 2.what are the three modes of running a test in winrunner 3.what is synchronization point 4.what are the contents present in a test case 5.do we need testing for the project 6.what is code review and code walk through At which phase the testing starts (begin) in the project How do we test Client server applications and a Web applications what is verification and validation what is adhoc testing what is traceability matrix what is base line document what is Test Life Cycle what is regression testing and retesting what is a BUG LIFE CYCLE what is a Bug what are defects what is functionality testing and system testing. a project has to be released in one day but the testing people got that project from the developers half of the day before so what they have to do to complete the testing process. 20 what are severity level and priority levels

1 Answers   Stag Computers,


Is there any group of software tester in India so as everybody can join them?

2 Answers  


Categories