How much Strength of the cube can attain in 7days
comparative 28 days strength?(as per IS code) ( specify the
ref.clause also)
Answer Posted / lalit kumar singh
Strength of cube in
07 days - 67%
28days - 85-90 %
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is 1/8 on the architect ruler denotes?
How to fix toll charge for a particular vehicle at toll booths in a highway?
what is the hanekom repairing material after concreting work
How to find permissible diagonal tensile stress in reinforced brick work
What is the quantity of cement in mix m20 concrete?
What is the origin of name railway sleepers?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
PL.tell me about civil engineering questions with answer
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
what is your role of in previous company as a construction manager