Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


in transmission line, if the load is suddenly increased at
the receiving end of the system the phase shift will
(a)decrease
(b)becomems zero
(c)increase
(d)not be affected

Answers were Sorted based on User's Feedback



in transmission line, if the load is suddenly increased at the receiving end of the system the pha..

Answer / ketan

increase

Is This Answer Correct ?    3 Yes 0 No

in transmission line, if the load is suddenly increased at the receiving end of the system the pha..

Answer / bhargav

C) increase

Is This Answer Correct ?    2 Yes 0 No

in transmission line, if the load is suddenly increased at the receiving end of the system the pha..

Answer / sagar kumar

I don't know this answer. I post answer only to receive correct answer.

Is This Answer Correct ?    1 Yes 0 No

in transmission line, if the load is suddenly increased at the receiving end of the system the pha..

Answer / anbarasan j

Not be affected

Is This Answer Correct ?    2 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

hey guys i scored 910 on GRE and 67 on TOEFL respectively.I have an aggregate of about 74%in my B tech.For which colleges should i apply for an MS program in electrical engineering.I am looking for colleges in NJ,SC,NC,GEORGIA, NY. Please reply with a good response.....

0 Answers  


For a Potential Transformer(PT), the primary neutral terminal must be grounded before energization. Why....? What will be heppend if we energize the PT without grounded the primary neutral point? Why..........?

2 Answers  


as per standards how many neutral earthings and body earthings are needed.please help me

2 Answers  


What is the purpose of taking Capacitance and Tan Delta Test in Transformer bushing?

2 Answers  


What is PCCB?

3 Answers   ICEL, Schneider,


can we connect transformer with star conected secondary to delta connected primary in series?

1 Answers  


if a 3phase 100kva distribution transformer , 400 v,50 hz, 4-wire system is loaded at 160 k.w mostly 1-phase Lighting & Airconditioning split a.c load what will be the net effect on the power system in terms of voltage, powerfactor, current , efficiency of xformer

0 Answers  


what is a drive ?

3 Answers  


is the electrical energy photo copy possible or not???????????? give me some idea about that i m very great full tu u.

5 Answers  


What is transformation ratio what it describes?

0 Answers   Cushman Wakefield,


1. Synchronization is not required A. Thermal B.Hydel C.Wind D.Nuclear

2 Answers   APGenco, Birla Power,


why are we adopting 132kv,220kv for transmission rather than using 440kv at all transmission lines as it gives lower losses?

2 Answers   APGenco,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)