what is the minium content of cementous material per cu
meter
Answer Posted / shridhar
The amount of cementitious mateiral is determined by amount
of portland cement plus amount of fly ash.The minimum
portland cement content should be 350 kg/m3 of concrete
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
What is OSHA compliance?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
wat would be the probable interview questions and GD topics for IOCL exam?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
List out some of the checking’s, done at the completion of construction?
How to take labor charges for construction of 1cum of concrete?
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
How much quantity of rod binding work by a rod binder per day
What out turn civil works
Explain the different types of roofing systems?
What is the use of offset command?
I am called for interview from north east power plant .so, I need some interview question which may help me.
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
how to prepare site mix design