why trip circuit supervision is taking through breaker contact? what happen if takendirectly?

Answers were Sorted based on User's Feedback



why trip circuit supervision is taking through breaker contact? what happen if takendirectly?..

Answer / k.prakashchandra

TSR is for beaker trip circuit

Is This Answer Correct ?    0 Yes 0 No

why trip circuit supervision is taking through breaker contact? what happen if takendirectly?..

Answer / mostafaghodrat

BECAUSE Switching contacts is C.B
This task is performed by changing the spring
This spring is the C.B

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

10 Mtr Hight of Lighting Arrestar how much area coverd??

0 Answers   OmniActive,


srij i need the relationship b/w KW AND KWH and with an electrical example. plz send if u can?

4 Answers  


BRIEFLY EXPLAIN THE STORAGE CLASSES AND THEIR TYPES IN C

0 Answers  


How to conduct the Magnetic Balance test on Power Transformer?

0 Answers  


how to calculate compresor capacity?

0 Answers  






present we are having 0.8pf but I want increase it up to 0.99 so what is the formula for it and how can i calculate?

3 Answers   ABB,


For some transformers we are using solid neutral earthing while some others we are using resistance earthing why ?

0 Answers  


Why we does earthing for transformer neutral point

5 Answers   amps, DLF,


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

0 Answers   Jindal,


what is ups Paralleling? how is load sharing at that time ? what are the things we have to note that time?

1 Answers  


what maximum range of star & delta in hp or kw ?

0 Answers   Makkah Hilton Towers,


What device is use for metering current at lt consumer end..??

2 Answers   Power Grid,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16637)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)