whenever i run the programe transfered to GL from payables
that programe is shown with warning error and not
transferred entries to GL
Answer / anil s
First of all the warning error need to be known if it WACO
(way after cut off) then ignore it as the current period
might not be set in the constant. A/P constant should be set.
In JDE the error and resolution is been screened in red so
that after reading it try to resolve
Is This Answer Correct ? | 6 Yes | 0 No |
accrual journal entries
what is the diffrence between 11i and R12 ?
Is it necessary to enable the SECURITY RULE check box along with CROSS VALIDATION SEGMENT RULE in flex field structure while setting up the CROSS VALIDATION RULE. plz clarify my dt
What are the steps and control checks in posting journal entries ?
What Are The Important Reports In GL?
HI, once we create the standard invoice then we can get journal entry item expense a/c-dr to liability a.c then item it will reflect through inventory, but liability a/c . it will reflect from GL , it is possible .
What is WHT in Financial Module and What would be tbe acc entry for the same?
Payable And Financial options?
What is the consolidation ?
MIN and MAX number of segments in Chart of accounts ?
How can we Define Corporate law sob and Income Tax law Sob?
Define suspense account in Oracle apps and why is it mandatory?