Answer Posted / sahilshah.civil@gmail.com
6 to 7 kg/sq ft for superstructure
4 to 5 kg/sq ft for podium
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
what is the meaning of degreasing of the euipment or line.
why does the most of civil engg is not intersted to going for teaching field?
What is meant by engineering drawing?
What quantity of 1.0 m3 bricks required?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
how many digree of freedom in four bar chain
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Please let me know what is the simplest way of Calculating Mix Designs
Define absolute co-ordinates?
what is m30 in concrete tiles
What materials were used to build the golden gate bridge?