Answer Posted / sahilshah.civil@gmail.com
6 to 7 kg/sq ft for superstructure
4 to 5 kg/sq ft for podium
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how i get all type of short type question answer about civil engg
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Why is concrete cube test carried out?
what is the productivity in aluminium shuttering per day
What are the main reasons for conducting pull-out tests for soil nails?
How to do rate analysis for concrete work including shuttering work?
Are you ready to relocate with your immediate family to United States as a new employee?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
What is Rankine Cycle?
What are the responsibilities of a site manager?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????