Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Any body tell me how can we calculate 1m3 quantity of cement
sand aggregrate in kg.

Answer Posted / selvanathan

in 1:2:4 concrete:

Take try volume : 54%

So, add try volume for 1 cum - concrete = 1.54

Cement volume:

1.54/(1+2+4)= 0.22 cum.
convert to kg. 0.22x1440=316.80 kg
Convert to bags = 316.8 / 50= 6.4 bags

Sand Volume:

0.22x 2 =0.44 cum. (2 is ration of sand)

Aggregate volume:

0.22x 4 =0.88 cum. (4 is ratio of aggregate.)

Is This Answer Correct ?    18 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What should be the standard roof height like to be?

1301


Explain what are the skills required to become an architect?

1219


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1869


How to come 1.54 from dry to wet concrete? 

2308


from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar

4701


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2145


How much of the strength of concrete comes from post- production curing?

3248


Differentiate first angle & third angle projection?

1187


Does brick grows bigger every year?

1200


how to calculate total cost for slab 35'×8'

1968


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

2142


Define What does civil status mean?

1500


what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

5273


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1777


detailed calculation of the amount of cement used?

2119