How to calculate the steel for 392c.meter*450c.meter rcc
slab
Answer Posted / deepak
steel percent,for Fe250-0.15% of Area of slab.
Fe415-0.12% of area of slab.
area of slab=392*450 m^2
=176400m^2
slab reinforcement=0.12%*179928=215.913 m2
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
What is hybrid foundation?
how to calculate the weight of concrete
What are the disadvantages while using stone dust as filler in pavements?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
What is the meaning of soil reinforcement?
what is relation between SPT N value and driving piles after conducting a soil test?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How many bricks are there in 100cft?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem