how wud i know that whether i have to use unitized package
substation or transformer?



how wud i know that whether i have to use unitized package substation or transformer?..

Answer / a.p.nanjappa

Necessity is the mother of inventions.
It is cost,project availability,nature of
project/management decisions decides unitized package unit
because it need less space,compact,modular&safe and
expensive.whwereas procuring transformer need
manufacturing,testing,....Time schedule

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

High voltage test procedure of in swgr board. why should measure millivolt drop on testing time?

0 Answers   NTPC,


As load in a transformer increases, mutual flux linkage in core= A increases B decreases C not change D first increase then decrease

2 Answers  


what is looping circuit in electrical lighting circuits?

5 Answers   L&T,


Give me the calculation steps to design an electromagnet to be work in 230V 50 Hz AC Supply. Also give force that is created by that electromagnet when it gets energized.

0 Answers   GE,


what is the difference between main meter CT and check meter CT?and what is the difference between main meter PT and check meter PT?

2 Answers   Tesco,






Cb closed condition if there is a tcs fail whether cb will trip or not

0 Answers   AADC,


How to calculate load requirement of a 50 flat apartment with 5 kw each unit,sizing of cable,transformer

1 Answers  


if we use a normal natural thundering; than approx how much amount of electricity we generate?

1 Answers   Visa Steel,


line diagram for mcb , mccb , rccb .

1 Answers  


What do you mean by pf of a generator? Power factor purely depends on the load (wether inductive, reactive or unity) then what does the pf mentioned on the generator nameplate means?

3 Answers  


How to calculate HT XLPE CABLE for 11 kv / 433 v , 1500 kva oil type transformer system? plz provide step by step calculation

15 Answers   Engineers India, Indian Railways, Polycab, Shashwat, Sitara Energy, Sonali Bank,


why field rhoestat is kept in minimum position while armature rheostat at maximun position?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)