how wud i know that whether i have to use unitized package
substation or transformer?
Necessity is the mother of inventions.
It is cost,project availability,nature of
project/management decisions decides unitized package unit
because it need less space,compact,modular&safe and
expensive.whwereas procuring transformer need
manufacturing,testing,....Time schedule
Is This Answer Correct ? | 0 Yes | 0 No |
High voltage test procedure of in swgr board. why should measure millivolt drop on testing time?
As load in a transformer increases, mutual flux linkage in core= A increases B decreases C not change D first increase then decrease
what is looping circuit in electrical lighting circuits?
Give me the calculation steps to design an electromagnet to be work in 230V 50 Hz AC Supply. Also give force that is created by that electromagnet when it gets energized.
what is the difference between main meter CT and check meter CT?and what is the difference between main meter PT and check meter PT?
Cb closed condition if there is a tcs fail whether cb will trip or not
How to calculate load requirement of a 50 flat apartment with 5 kw each unit,sizing of cable,transformer
if we use a normal natural thundering; than approx how much amount of electricity we generate?
line diagram for mcb , mccb , rccb .
What do you mean by pf of a generator? Power factor purely depends on the load (wether inductive, reactive or unity) then what does the pf mentioned on the generator nameplate means?
How to calculate HT XLPE CABLE for 11 kv / 433 v , 1500 kva oil type transformer system? plz provide step by step calculation
15 Answers Engineers India, Indian Railways, Polycab, Shashwat, Sitara Energy, Sonali Bank,
why field rhoestat is kept in minimum position while armature rheostat at maximun position?